Container power station
Desert-ready 275 – 2200 kVA- Standard 20S / 40HC, non-standard on request
- 6 cm acoustic lining, labyrinth air path
- Double doors, stainless hinges, integrated control
Four formats — open frame, silent canopy, container and trailer — covering the mainstream diesel range. We specify to your site conditions, assemble the full list, and ship on your vessel schedule, together with camp MRO packages, steel and marine equipment, so you deal with one supplier instead of five.
The six below are ordered by how they perform on Gulf desert and remote sites: first whether the format survives sand and heat, then the power band and container loading. Container sets land and run, so they lead. Open frame is the best value, but a desert site needs a separate machine room — we only recommend it where a building already exists. All figures are from the maker's catalogue; nothing is estimated.






Nameplate ratings are set at 40 °C, 1,000 m and 60% RH. Gulf and Iraqi summers push surface temperatures past 55 °C, so real output is lower than the plate. Size the load against the plate and the set runs overloaded for life — the most common specifying error on desert projects.
| Altitude | 25 °C | 40 °C | 50 °C |
|---|---|---|---|
| 0 m | 100% | 96% | 92% |
| 500 m | 95% | 91% | 87% |
| 1,000 m | 90% | 86% | 82% |
| 1,500 m | 85% | 80% | 75% |
| 2,000 m | 80% | 75% | 70% |
Example: Riyadh sits near 600 m. For 1,000 kVA usable at 50 °C you need a nameplate of 1,000 ÷ 0.92 ≈ 1,087 kVA. A HAT (high ambient temperature) build holds full rating at 50 °C and removes that 8% gap.
Above 600 m or 40 °C, we issue a site-specific derating curve and corrected sizing with the quotation — we do not size straight off the nameplate.
Load profile, prime or standby, ambient temperature and altitude, paralleling and changeover needs.
Match set and format to the band, then issue a configuration list with dimensions and interfaces.
Sets ship with camp MRO, steel and marine items under one bill of lading.
Shipped from the Hainan Free Trade Port, tracked through to port of discharge.
We specify, source and consolidate — we are not the set manufacturer. Final figures follow the maker's technical documents and are re-checked line by line before contract.
Send the power band, the format and the site conditions. No price in the first exchange — we settle the scope first.